This particular F-27 has many upgrades installed by its previous owner. To enable shallow water operation, a dagger-style rudder, rudder cassette and folding tiller by CCI Composites was installed, saving considerable weight and reducing drag. A Ballenger Spars second spreader kit was installed to s...
This particular F-27 has many upgrades installed by its previous owner. To enable shallow water operation, a dagger-style rudder, rudder cassette and folding tiller by CCI Composites was installed, saving considerable weight and reducing drag. A Ballenger Spars second spreader kit was installed to stiffen the mast and all standing rigging was replaced with 316 SS wire and chrome bronze turnbuckles. The cap shrouds and associated adjustment tackles were replaced with Dynex Dux from Colligo Marine. A Harken Unit 0 furling system was installed on the headstay for headsail furling. A Tides Marine mast track was fitted, greatly easing mainsail raising and lowering. All mast lights and wiring were replaced. The three deck-mounted mast wiring plugs were removed and replaced with a single gland. The mast wires route below deck to a junction box for a protected, dry connection. A slab reefing system for three reef points was installed to the boom, with all reef lines leadingto the cockpit. An 8:1 outhaul system was installed in the boom.An ABYC compliant electrician installed a 12 function electrical panel and supervised all wiring Installation and electrical design.Has a brand new autopilot. The trailer had new tires installed two years ago.Show More